Ramming the blend of sub soils into the shuttering formwork
Stelios gets to grip with a modified Scabbler which is now a Pneumatic Rammer
Scaffolding erected and hoist installed
Nick and Neil discuss the finer points of moisture levels
First section of shuttering in place, if this stays level then the rest should follow
Shuttering located on the foam glass upstand
Two different sub soils will be blended to give us the mix we need
The foam glass base which the wall will be rammed off
The 150mm X 45mm framework pre-assembled and loaded on the trailer
The main sides of the shuttering varnished and ready for loading
All the support ribs assembled ready to take to Girton
This is the bottom section of the shuttering, 4.5 of these will be needed to enclose the 5.2m high feature wall
The 18mm plywood is extended to 2.750m